LARGE POWER TIME OF USE SERVICE - SCHEDULE LPTU - Bill Code (51)

APPLICABILITY: This rate is applicable to Members under the Standard Terms and Conditions for Electric Service with not less than 40 KVA of capacity to be used for power and general lighting.

TYPE OF SERVICE: Service will be rendered at the Cooperative's standard phase and voltage at point of service.

MONTHLY RATE: The lesser of the following rates A & B plus Part II. 

Part I
The lesser of following Rates A & B
Rate A Rate B
Demand Charge Service Charge
All KVA - $7.50 per billing KVA $20.00
Energy Charge Plus Energy Charge
First 50 KWH per KVA of billing KVA - 3.642 cents per KWH First 1000 KWH used - 6.462 cents per KWH
Next 100 KWH per KVA of billing KVA - 2.842 cents per KWH Next 2000 KWH used - 5.862 cents per KWH
Next 150 KWH per KVA of billing KVA - 2.442 cents per KWH Remaining KWH - 5.462cents per KWH
Remaining KWH - 2.202 cents per KWH  
Part II
$15.83 per KVA of maximum demand registered during any fifteen (15) minute period between the hours of 5:00 p.m. and 7:59 p.m., less 10 percent of the billing KVA or 40 KVA whichever is less, for the months of June, July, August, and September, and 6:00 a.m. and 7:59 a.m. for the months of November, December and January.

DETERMINATION OF BILLING KVA: Billing KVA demand used for monthly rate, Part I, shall be the KVA demand required during any fifteen (15) minute period of maximum use during the billing months of May, June, July, August and September, not including the interval used in the monthly rate, Part II.

For all other months, 80 percent of the average of the most recent May, June, July, August and September billing demands for the time periods not included in Part II above.

MINIMUM CHARGE: The minimum demand charge shall be the largest of not less than 25 percent of the first 500 KVA of contract power plus 50 percent of any excess of 500 KVA times $7.50 per KVA. One dollar per KVA of required transformer capacity. The charge will be specified in a contract for service.

POWER FACTOR ADJUSTMENT: The Member agrees to maintain unity power factor as nearly as practicable. KW demand charges will be adjusted for consumers with 100 KW or more of measured demand to correct for average power factors lower than 92 percent. Such adjustments will be made by adding one percent to the metered demand for each RKVA that the KVA load is less than 92 percent power factor. The Cooperative reserves the right to use peak power factor rather than average power factor where it deems necessary.

POWER COST ADJUSTMENT: The above charges shall be increased as determined under Power Cost Adjustment Clause PCA-DE.

TAX ADJUSTMENT CHARGE: The monthly bill will be adjusted for any new or increased taxes on revenues, load and-or energy, or which can otherwise be directly allocated to service hereunder.

RIDERS: Riders LPI, JCIC, FF-CR, SCRR and FRP are available under this schedule.